References
- Renovation of the "Zum Hirsch" clubhouse in Meuselbach "Zum Hirsch" in Meuselbach Structural engineering/building renovation 2006 - 2008
| Realisation: |
2006 - 2008
|
| Contractor: |
Commune Meuselbach - Schwarzmühle
|
| Construction costs: |
600.000 EUR
|
- Renovation and conversion of the "Zur Bergbahn "clubhouseStructural engineering/building renovation 1995
| Realisation: |
1995
|
| Contractor: |
Commune Lichtenhain Bergbahn
|
| Construction costs: |
700.000 EUR
|
- Renovation and conversion of a residential and commercial building in the district of SchaalaStructural engineering/building renovation 1994 - 1995
| Realisation: |
1994 - 1995
|
| Contractor: |
Mr. Bartl, Am Wachtelberg 10, Rudolstadt
|
- Renovation of parish hall in MeuselbachStructural engineering/building renovation 2003
| Realisation: |
2003
|
| Contractor: |
Commune Meuselbach-Schwarzmühle
|
| Construction costs: |
300.000 EUR
|
- Renovation of village museum in DöschnitzStructural engineering/building renovation 2005 - 2006
| Realisation: |
2005 - 2006
|
| Contractor: |
Commune Döschnitz
|
| Construction costs: |
120.000 EUR
|
- Renovation of the Meura technology baseStructural engineering/building renovation 2006 - 2008
| Realisation: |
2006 - 2008
|
| Contractor: |
Commune Meura
|
| Construction costs: |
190.000 EUR
|
- Bridge over the millpond in Uhlstädt districtHydraulic engineering /landscape design 2004
| Realisation: |
2004
|
| Contractor: |
Commune Uhlstädt-Kirchhasel
|
| Construction costs: |
100.000 EUR
|
- Renovation of the Auebad swimming pool in WittgendorffHydraulic engineering /landscape design 2004 - 2005
| Realisation: |
2004 - 2005
|
| Contractor: |
Commune Wittgendorf (in the Schwarza Valley)
|
| Construction costs: |
450.000 EUR
|
- Waterways development in KatzhütteHydraulic engineering /landscape design 2004
| Realisation: |
2004
|
| Contractor: |
Commune Katzhütte
|
| Extent of construction: |
stream length approx. 20 km |
- Renaturisation of the weir system in the Katze riverHydraulic engineering /landscape design 2005
| Realisation: |
2005
|
| Contractor: |
Commune Katzhütte
|
| Construction costs: |
90.000 EUR
|
- Agricultural road in Rudolstadt-Schaala, bridge over the Schaalbach streamHydraulic engineering /landscape design 2006 - 2007
| Realisation: |
2006 - 2007
|
| Contractor: |
Rudolstadt town
|
| Construction costs: |
280.000 EUR
|
- "Gründchen" flood protectionHydraulic engineering /landscape design 2007 - 2008
| Realisation: |
2007 - 2008
|
| Contractor: |
Commune Katzhütte
|
| Construction costs: |
240.000 EUR
|
- Development of "Die Pfarreichen" commercial estate in Bad BlankenburgRoad construction /location design1999 - 2003
| Realisation: |
1999 - 2003
|
| Contractor: |
LEG Thüringen mbH, Erfurt
|
| Construction costs: |
630.000 EUR
|
- Village square design at the former Meuselbach pharmaceutical companyRoad construction /location design2002
| Realisation: |
2002
|
| Contractor: |
Commune Meuselbach-Schwarzmühle
|
| Construction costs: |
500.000 EUR
|
- Renovation of local streets in DeesbachRoad construction /location design2004 - 2006
| Realisation: |
2004 - 2006
|
| Contractor: |
Commune Deesbach
|
| Construction costs: |
610.000 EUR
|
- Local street / village square design in GrossneundorfRoad construction /location design2006 - 2007
| Realisation: |
2006 - 2007
|
| Contractor: |
Gräfenthal town
|
| Construction costs: |
550.000 EUR
|
- Village street / village square in PartschefeldRoad construction /location design2006 - 2008
| Realisation: |
2006 - 2008
|
| Contractor: |
Commune Uhlstädt-Kirchhasel
|
| Construction costs: |
800.000 EUR
|
- Road bridge renovation in Röbschütz districtRoad construction /location design2008
| Realisation: |
2008
|
| Contractor: |
Commune Uhlstädt-Kirchhasel
|
| Construction costs: |
150.000 EUR
|
- Oberhain - Barigau / Barigauer WegRural road construction2004 - 2005
| Realisation: |
2004 - 2005
|
| Contractor: |
Commune Oberhain
|
| Construction costs: |
90.000 EUR
|
- Gräfenthal, Lichtenhain district/ HöhkuppenwegRural road construction2005
| Realisation: |
2005
|
| Contractor: |
Grafenthal town
|
| Construction costs: |
120.000 EUR
|
- Gräfenthal, Gebersdorf district / MorassinawegRural road construction2007
| Realisation: |
2007
|
| Contractor: |
Grafenthal town
|
| Construction costs: |
140.000 EUR
|
- Cursdorf / route to water towerRural road construction2008
| Realisation: |
2008
|
| Contractor: |
Commune Cursdorf
|
| Construction costs: |
60.000 EUR
|
- Sewer / drinking water supply for the Hotel "Marienturm" in RudolstadtSewage system / drinking water1994 - 1995
| Realisation: |
1994 - 1995
|
| Contractor: |
Neumann family, Hotel and Restaurant "Marienturm" Rudolstadt
|
| Construction costs: |
250.000 EUR
|
- Renovation of sewage system / drinking water supply in Rudolstadt, Keilhau districtSewage system / drinking water2005 - 2006
| Realisation: |
2005 - 2006
|
| Contractor: |
Zweckverband Wasser / Abwasser (ZWA) Saalfeld-Rudolstadt (communal water/sewage co-operative)
|
| Construction costs: |
260.000 EUR
|
- Effluent pressure pipe and drinking water supply in Schaala-Eichfeld, RudolstadtSewage system / drinking water2005- 2007
| Realisation: |
2005 - 2007
|
| Contractor: |
Zweckverband Wasser / Abwasser (ZWA) Saalfeld-Rudolstadt (communal water/sewage co-operative)
|
| Construction costs: |
420.000 EUR
|
- Renewal of sewage system/drinking water supply in Blöschnitzgasse, KirchhaselSewage system / drinking water2007
| Realisation: |
2007
|
| Contractor: |
Zweckverband Wasser / Abwasser (ZWA) Saalfeld-Rudolstadt (communal water/sewage co-operative)
|
| Construction costs: |
140.000 EUR
|
Address
Ingenieurbüro IBU
Am Wachtelberg 10
07407 Rudolstadt/Thüringen
Phone
+49 (0)3672 - 41 27 42
Fax
+49 (0)3672 - 41 34 21
Email Address
Ingenieurbüro Bartl is certified for
DIN ISO-9001:2000